Skip to main content
This section provides a detailed guide for each of the APIs, with sample code and responses.

Testing the APIs from the browser

The reference pages allow you to call the APIs directly from the browser. To get started:
  1. Create a developer account on the Staging or Production consoles. Read more about the environments here.
  2. Create an API key from the API keys tab on the console, with the permissions required for the APIs you want to use.
  3. From the page of your API of choice, insert the right API key in the authorization slot, introduce the different parameters, and call “Send”.
  4. (Optional) To call APIs in the production environment, find the API endpoint selector () next to the endpoint URL, and change it to www.crossmint.com/api.
The following guide will show you how to create a wallet and mint an NFT into it within 5 minutes. For this, make sure your API key has the scopes wallets.create, and nfts.create.
Follow the next steps to create a wallet within 5 minutes:
1

Navigate to the Create Wallet page

Navigate to create wallet endpoint screenshot with light theme
2

Select the correct environment for the API key you created

Set environment URL screenshot
3

Input your API key into the Authorization section

Set x-api-key screenshot
4

Input the `body` parameters

You may add any additional properties. Each API reference page includes the full list of properties and admissible values.
Set body params screenshot with light theme
5

Send the request

Scroll back to the top of the page and click the blue Send button to trigger the API call.
Send request screenshot with light theme
Here is an example response object:
create user wallet response screenshot with light theme
Success! The next guide will show you how to mint an NFT into this wallet and view the content.
In the previous guide, you created a wallet. Now you will deliver an NFT into it and read the wallet’s content.
1

Navigate to the Mint NFT page

Open in a new tab here: /api-reference/minting/nfts/mint-nft

Mint NFT in api playground screenshot with light theme
2

Enter the `default-polygon` collectionId

This is a default collection associated to your account. You can create new ones using the Create Collections API.
Enter collectionId screenshot with light theme
3

Select the [EVM] Metadata URL metadata option

The selector to choose between the different metadata option can be hard to spot. Look closely at the screenshots below to see where it is.
Select EVM metadata URL option screenshot with light theme

Enter metadata URL screenshot with light theme
4

Enter metadata URL

You can provide your own or use this example URL:

This URL must point to a valid JSON file that adheres to EVM metadata standards.
Enter metadata url screenshot with light theme
5

Enter the `recipient`

There are two options for the recipient parameter. The first enables minting to an email address. The second enables minting directly to a wallet address.

Enter your own email address on this step and you can login to see your NFT in the Crossmint wallet later, which can be accessed from crossmint.com or staging.crossmint.com if you are in staging.
Set recipient screenshot with light theme
6

Set `reuploadLinkedFiles` to false

This will prevent unnecessary uploading of files that are already pinned to IPFS.

Crossmint has a 10MB re-upload size limit. For larger files, upload your media to IPFS, create a metadata.json as shown above, submit the metadata file’s URL, and ensure reuploadLinkedFiles is set to false.

The default option is true.

Set reuploadLinkedFiles to false screenshot with light theme
7

Send the request

Scroll back to the top of the page and click the blue Send button to trigger the API call.
Click send screenshot with light theme
Here is an example response object:
mint nft example response screenshot with light theme
8

View the NFT in your wallet

If you followed this guide closely you can view the NFT in the staging wallet at https://staging.crossmint.com/user/collection.If you minted directly to a wallet address you can view the NFT in that application. Ensure you are accessing it from a testnet if you used staging.

Next Steps

Test any other API directly from the reference page. You can find more information about the products on the documentation guides.